Building the training centre
CODE | IB 230308 Bouw Centrum |
PROJECT | Building the training centre |
COSTS | Rp. 165.450.000/ 11810 euro |
SPONSOR |
Being sought |
Construction of the training center started on March 23, 2008 and has since been completed, except for a few details. It has become a building with a large functional space, which can be arranged as desired. The costs of this building have increased considerably, partly due to the rise in all kinds of prices, including building materials. As a result, the APA Foundation is forced to look for sponsors for the construction costs, for example in the form of sponsoring one of the units or part of the building.